Installation of Bollards for Chiseldon Parish Council
Project Overview
This project involved the installation of 22 concrete bollards across two key verge areas within Chiseldon Parish. The aim to prevent dangerous and obstructive parking and ensure safe access for service vehicles, maintaining clear passage on local roads.
- Area 1: 8.2 metres
- Area 2: 19.5 metres
- All works carried out in compliance with Section 171 licence. Street works accredited operatives and supervisors present on-site throughout the project.
- All work zones clearly signed and guarded in accordance with Chapter 8 traffic management.
- 1370mm bollards positioned at appropriate intervals for maximum effectiveness, verge reinstated, levelled and grass seeded upon completion.
ABL Services provided a competitive quote and dealt with the permissions that we needed. The work was completed promptly and to a high standard. We are pleased with the final result.
Chiseldon Parish Council